Case study
29 team-weeks of scheduling platform, built in 2 days
Calendars, resources and bookings for a homecare service, delivered with every acceptance criterion traced to a test.
The problem
A regulated healthcare business needed a scheduling service that its own teams and partner systems could rely on. The internal estimate was three phases and roughly 29 weeks for a team of five.
How we approached it
- Three written phase plans with acceptance criteria before the build
- A shared multi-tenant access-control framework built first, with 822 automated tests
- Each phase built by parallel agents and closed only when its acceptance suite passed
What was built
- Scheduling domain, availability engine, holds and bookings
- Role-based, row-level security across tenants
- A reference client and phone-friendly calendar
- Infrastructure as code and deployment pipeline
Stack
- .NET 10
- Dapr
- Azure SQL
- Angular
- Bicep
What changed
- Acceptance criteria mapped to tests
- A reusable security framework for later projects
- Production hardening scheduled as a normal next step
Healthcare scheduling platform
Estimated:
29 team-weeks. Delivered: 2 daysMulti-tenant access-control framework
Estimated:
14 weeks. Delivered: 5 days
Bars are to one scale in working days, at five days to a week, using the lower figure of any range. A few hours is drawn as half a day, and the shortest bars have a minimum width so they stay visible. Builds that were never estimated are left out.